Summer Traffic Patterns

~Updated May 23, 2017

As building, utility and infrastructure improvements associated with UConn200021st Century UConn and Next Generation Connecticut (NGC) continues this summer, traffic patterns on the following campus roads (as shown on this map) will be directly impacted:

  • North Eagleville Road (between Discovery Drive and Route 195)
    • Open to local & construction traffic only, one-way outbound (east)
      • Follow detour signs
    • No access from Route 195 South
      • Enter campus at Discovery Drive (via Route 44)
    • No access from Route 195 North
      • Enter campus at Bolton Road or Mansfield Road
  • Hillside Road
    • Open to all traffic, including construction vehicles
    • Single lane of travel at Gampel Pavelion
      • Alternating direction – Expect Delays
  • Whitney Road
    • Open to local traffic only
    • No through traffic to Gilbert Road
      • Turn-around at Dodd Center
    • On-street parking reductions
  • Auditorium Road
    • Closed to vehicular traffic
      • Construction & service vehicles only
  • Jorgensen Road
    • Open to local traffic only
      • Accessible drop-off area for theater events

Construction activities began mobilizing shortly after Commencement and will continue through this fall in many locations.  Changes to these temporary traffic patterns are not anticipated however updates will be announced and posted when conditions warrant.  Some delays approaching these areas should be expected.

We thank you for your patience and appreciate your understanding while we work to improve our campus facilities.

For more information, please contact Sean Vasington at sean.vasington@uconn.edu