UPDATED 10/20/2017 | Traffic Impacts due to Construction Activities | October 2017

As building, utility and infrastructure improvements associated with UConn2000, 21st Century UConn and Next Generation Connecticut (NGC) continues into the fall semester, traffic patterns on the following campus roads (as shown on this map) will be directly impacted:

ALUMNI DRIVE

  • Open to All Traffic, Limited Delays

AUDITORIUM ROAD & EXTENSION

  • Closed to Vehicular Traffic
  • Construction & Service Vehicles Only

BABBIDGE ROAD

  • Open to Local Traffic, Authorized Vehicles Only at Library

BENTON SERVICE DRIVE

  • Open to Service, Emergency & Special Permit Vehicles Only
  • Caution: Pedestrian Zone

COVENTRY ROAD

  • Closed to Vehicular Traffic at Maple Lane
  • Construction & Service Vehicles Only

FAIRFIELD WAY

  • Open to Emergency Vehicles Only
  • Caution: Pedestrian Zone

GAMPEL SERVICE DRIVE

  • Open to Local Traffic Only, Periodic Delays

GLENBROOK ROAD

  • Open to All Traffic
  • Right turn only at North Eagleville Road
  • Periodic Delays at Central Utility Plant, Obey Crossing Guards

HILLSIDE ROAD

  • Open to All Traffic
  • Frequent Delays at Jim Calhoun Way
  • Caution: Pedestrian Crossings

JORGENSEN ROAD

  • Open to Local Traffic Only
  • No Thru Traffic
  • Accessible Drop-Off Area Provided for Events

MANSFIELD WAY

  • Open to Emergency Vehicles Only
  • Caution: Pedestrian Zone

NORTH EAGLEVILLE ROAD

  • Open One-Way (Eastbound) between Discovery Drive and Glenbrook Road to Construction & Local Traffic Only
    • Caution: Pedestrian Crossings, Obey Crossing Guards
  • Open Two-Way between SR195 and Glenbrook Road to All Traffic

WHITNEY ROAD & EXTENSION

  • Open to Local Traffic Only
  • On-Street Parking Reductions
  • Additional Parking Restrictions & Reductions at Dodd Center

Many construction activities will continue to taper off through the fall semester while a few locations will remain mobilized through the winter months.  These traffic patterns are subject to change on a daily basis however updates will be announced when significant changes warrant.

We thank you for your patience and appreciate your understanding while we work to improve our campus facilities.

For more information, please contact Sean Vasington at sean.vasington@uconn.edu