Traffic Impacts due to Construction Activities | March 2018

As building, utility and infrastructure improvements associated with UConn2000, 21st Century UConn and Next Generation Connecticut (NGC) continues, traffic patterns on the following campus roads (as shown on this map) will be directly impacted:

ALUMNI DRIVE

  • Open to All Traffic, Limited Delays

AUDITORIUM ROAD & EXTENSION

  • Closed to Vehicular Traffic
  • Construction & Service Vehicles Only

BABBIDGE ROAD

  • Open to Local Traffic, Authorized Vehicles Only at Library

BENTON SERVICE DRIVE

  • Open to Service, Emergency & Special Permit Vehicles Only
  • Caution: Pedestrian Zone

COVENTRY ROAD

  • Closed to Vehicular Traffic at Maple Lane
  • Construction & Service Vehicles Only

FAIRFIELD WAY

  • Open to Emergency Vehicles Only
  • Caution: Pedestrian Zone

GAMPEL SERVICE DRIVE

  • Open to Local Traffic Only, Occasional Delays
  • Caution: Pedestrian Crossings

GLENBROOK ROAD

  • Open to All Traffic, Periodic Delays during Class Change
  • Caution: Pedestrian Crossings
  • Right turn only at North Eagleville Road
  • Periodic Delays at Central Utility Plant, Obey Crossing Guards

JIM CALHOUN WAY

  • Open to All Traffic
  • Occasional Delays at Gampel Pavilion March 20-26
  • Caution: Pedestrian Crossings

HILLSIDE ROAD

  • Open to All Traffic
  • Frequent Delays approaching North Garage and Jim Calhoun Way
  • Caution: Pedestrian Crossings

JORGENSEN ROAD

  • Open to Local Traffic Only, No Thru Traffic
  • Accessible Drop-Off Area Provided for Events

MANSFIELD WAY

  • Open to Emergency Vehicles Only
  • Caution: Pedestrian Zone

NORTH EAGLEVILLE ROAD

  • Open to All Traffic
  • Frequent Delays at Auditorium Road Ext, Torrey Life Sciences Building, and Atwater Laboratory
  • Occasional Delays between Chemistry Building and Storrs Road (Route 195)
  • Caution: Pedestrian Crossings
  • Obey Traffic Controls at Glenbrook Road

WHITNEY ROAD & EXTENSION

  • Open to Local Traffic Only
  • On-Street Parking Reductions
  • Additional Parking Restrictions & Reductions at Dodd Center

Construction activities will remain isolated to select areas of campus through the spring semester.  Traffic patterns are subject to change on a daily basis however updates will be announced when significant changes warrant.

We thank you for your patience and appreciate your understanding while we work to improve our campus facilities.

For more information, please contact Sean Vasington at sean.vasington@uconn.edu